Case Study – Improving Production of Foaming Products in Drum Fillers
When filling a 55 gallon drum with a foaming liquid, it is accepted practice to allow two and a half minutes to fill 450 lbs. at 75 gallons per minute input. Most companies accept this drum filling problem as a normal part of business. So, when they need to increase production, they simply purchase another drum filling machine, or start a second shift.
The Customer
A worldwide maker of cleaning chemicals has plants in five countries all with foaming liquid problems. Most of their operations use second and third shift labor just to keep up with the production demands.
The Challenge
Create a drum and tote filling system that reduces foam during the filling cycle, which would increase production without having to purchase additional filling machinery. In addition, the filling machine will provide a rapid and justifiable payback.
The Solution
We developed a method of reducing foam by making a tear-drop valve at the end of a drum filling lance. Then, through extensive research and development, we found a special pump that limited air into the infeed line. After adding the pump to our filling machinery we created a recirculation loop and had a one-of-a-kind solution…a “No-Foam” package that can be added to any of our standard filling machines.
The Payback
When the customer brought their problem to us, filling a 55 gallon drum took 2 minutes and 12 seconds and had 4” of foam at the top of the drum. The new filling machine, with the No-Foam package, filled a 55 gallon drum in just 56 seconds with only 1/2” of foam at the top.
That meant that the new filling machine more than doubled the customer’s liquid filling output and gave them a payback on a $140,000 drum filling system in less than 60 days.
Drum Filling Study
Filling 55 gallon drums | BeforeNo-Foam package | AfterNo-Foam package |
Number of drums studied | 170 | 170 |
Medium foam – average cycle time per drum | 132 seconds | 56 seconds |
High foam – average cycle time per drum | 180 seconds | 77 seconds |
Percent of increased production | 136% | 137% |
Number of drums filled per 8 hour shift | 218 | 514 |